End-to End logistic project UK-GmbH-UAE-Nigeria Sensia Metering systems
Project: RFS 619 CAB HHOG Passive Cooling Shelter, Metering Control Panel, LACt 6”-8”
Project: RFS 619 CAB HHOG Passive Cooling Shelter, Metering Control Panel, LACt 6”-8”
Project: Project: GE GT-15 Rotor and custom made skid from Dubai to Nigeria, end to end
Completion: 18 November 2021
Project: Breakbulk Dubai to Nigeria, end to end
Cargo: 23,000 M3 Dredging materials and 330 Ton Multicat Tugboat
In the last decade we designed, engineered procured, shipped and installed multiple hangars. Megadoor, Butzbach and locally produced hangar doors as by the client demands.
In 2018 we received a request to find a dredger for B&Q Dredging, part of the Nestoil Group in Nigeria. read the entire story from procurement, overhauling and the transportation from Germany, via The Netherlands to Nigeria.
Full overhaul of a dredger engine on location, Lagos
Assistance in finding, purchasing and delivery of a VLCC (Very Large Crude Carrier) supertanker
PROC-BQ-2017 Boosterstation-M3